• VENDOR PORTAL
  • Contact Us
  • VENDOR PORTAL
  • CONTACT US
  • ABOUT US
  • PROJECTS
  • SERVICES
  • SAFETY
  • CAREERS
  • NEWS
  • About
  • Core Values
  • Quality
  • Leadership
  • Supplier Diversity
  • Awards
  • Community
✕
Week 2 – MPG PDPM – Michael Penland
May 26, 2018
Week 2 – GM WTC – Jacob Rhodes
May 30, 2018

Week 2 – GM WTC – Lindsay Kowalewski

May 29, 2018
Categories
  • Uncategorized
Tags

Good Morning Everyone,
During week 2 I spent my time at the GM WTC with Brian Polakowski. These past 2 weeks we have spent time preparing for our new project at the Climatic Wind Tunnel (CWT). We have had to send out project deliverables including: EMR, RIR, Certificate of Insurance, OSHA 300A Logs, FMEAs, SDS, etc. This is an important process to complete before a project starts because each subcontractor that is performing work on the site needs to submit these deliverables before they can work. I got to complete some SOP’s at the Asset Sustainment Project including the steam plant where I found a hazardous hole in the floor, which was immediately fixed. I also had time this week to become substation trained and learn the basics of a electrical safety while working in a substation. After the training I was able to enter the substation at the GM WTC with a qualified electrician. This was cool to see as I wasn’t familiar with substations and how they really worked. I have also been able to learn how to conduct orientations for the subcontractors who are coming to work on our sites.
This week was eventful and I got to learn something new each day of the week. I am excited to see how much I learn by the end of this internship.
Sincerely,
Lindsay

Share

Related posts

February 28, 2023

Ideal Contracting Announces New Promotion To Management Team


Read more
June 29, 2022

Ideal Contracting Receives TAUC Safety Award


Read more
July 7, 2021

Ideal Contracting Named a 2020 Supplier of the Year Winner by General Motors


Read more
Week 2 – MPG PDPM – Michael Penland
May 26, 2018
Week 2 – GM WTC – Jacob Rhodes
May 30, 2018

Week 2 – GM WTC – Lindsay Kowalewski

May 29, 2018
Categories
  • Uncategorized
Tags

Good Morning Everyone,
During week 2 I spent my time at the GM WTC with Brian Polakowski. These past 2 weeks we have spent time preparing for our new project at the Climatic Wind Tunnel (CWT). We have had to send out project deliverables including: EMR, RIR, Certificate of Insurance, OSHA 300A Logs, FMEAs, SDS, etc. This is an important process to complete before a project starts because each subcontractor that is performing work on the site needs to submit these deliverables before they can work. I got to complete some SOP’s at the Asset Sustainment Project including the steam plant where I found a hazardous hole in the floor, which was immediately fixed. I also had time this week to become substation trained and learn the basics of a electrical safety while working in a substation. After the training I was able to enter the substation at the GM WTC with a qualified electrician. This was cool to see as I wasn’t familiar with substations and how they really worked. I have also been able to learn how to conduct orientations for the subcontractors who are coming to work on our sites.
This week was eventful and I got to learn something new each day of the week. I am excited to see how much I learn by the end of this internship.
Sincerely,
Lindsay

Share

Related posts

February 28, 2023

Ideal Contracting Announces New Promotion To Management Team


Read more
June 29, 2022

Ideal Contracting Receives TAUC Safety Award


Read more
July 7, 2021

Ideal Contracting Named a 2020 Supplier of the Year Winner by General Motors


Read more
  • Phone
    313.843.8000
  • Address
    2525 Clark Street, Detroit MI, 48209

Helpful Links

  • About Us
  • Projects
  • Services
  • Safety
  • Careers
  • News and Insights

Social Media

Stay Connected

Sign Up for Our Newsletter


    © 2023 Ideal Contracting. All Rights Reserved.