• VENDOR PORTAL
  • Contact Us
  • VENDOR PORTAL
  • CONTACT US
  • ABOUT US
  • PROJECTS
  • SERVICES
  • SAFETY
  • CAREERS
  • NEWS
  • About
  • Core Values
  • Quality
  • Leadership
  • Supplier Diversity
  • Awards
  • Community
✕
Week 11 – Pontiac – Clay Kurkechian
July 31, 2017
Executive Interview with Rachael Johnson – Tony Saucedo
August 1, 2017

Week 12 – Toyota – Steven Sinn

July 31, 2017
Categories
  • Uncategorized
Tags

This week out at Toyota has been another busy one. This week being able to dig into some of Ideals other self preform trades. Hard at work for Ideal Is Doug Card and his civil crew, taking on an intricate Storm Tech system also some self preformed concrete pours. Earlier in my blogs I had shown the Pervious Pavement Parking lot, with what Doug has going on I am able to show you what makes the pavement work, below the surface. Seen in the pictures below are some large yellow arches, these are the Storm Tech Trenches, these allow for water to pool and flow as if it were ground water. This water from the system then feeds the retention pond that is located in the front of the facility. Without this the Pervious asphalt would have no place to drain and could not be recycled. Not to far from the excavation that is in progress is a concrete pour. This pour is relatively large and will act as a pad for a controls station for the fuel farm behind it. Please see attached pictures below.

Share

Related posts

February 28, 2023

Ideal Contracting Announces New Promotion To Management Team


Read more
June 29, 2022

Ideal Contracting Receives TAUC Safety Award


Read more
July 7, 2021

Ideal Contracting Named a 2020 Supplier of the Year Winner by General Motors


Read more
  • Phone
    313.843.8000
  • Address
    2525 Clark Street, Detroit MI, 48209

Helpful Links

  • About Us
  • Projects
  • Services
  • Safety
  • Careers
  • News and Insights

Social Media

Stay Connected

Sign Up for Our Newsletter


    © 2023 Ideal Contracting. All Rights Reserved.