This week there has been a lot going on with building AB. Today Barton Malow started the level 2 concrete pour. Building AB is close to being done with iron work, maybe another week or two until we shift from AB to building C. A lot of talk has been going on about the Vector Foil Tech job now that building AB is almost done. The Vector Foil Tech job is called the Via Roof system where Ideal will connect building AB and C to the main arena creating a roof that is like a big glass canopy. But this job is a little ways off we have to install connectors on the stadium to connect the beams. This is unique job its self and to add the steel that we will be erecting is being fabricated in Turkey, which will be shipped on freighters and trucked to the Event Center. Here is a few pictures of the building AB concrete pour.