Commercial
Ideal Contracting proudly served as the general contractor for the University of Michigan’s Museum of Arts Alumni Memorial Hall Marble Floor Replacement. Originally constructed in 1910, the existing marble floor had reached the end of its lifespan due to heavy wear and uneven settling. Our team demolished and replaced the marble floor while protecting adjacent occupied areas with temporary barriers and floor protection, assessed and prepared the structural concrete for new finishes, installed a new mortar bed, and replaced in-floor electrical systems.
Given the age and sensitivity of the century-old building, a full-scale mock-up was conducted several months before construction began. The purpose was to monitor vibration levels generated during demolition, evaluate dust-control measures, and confirm the work could be completed without disrupting active museum operations or adversely affect the structural integrity of the historic building.
One primary challenge of the project was completing the work while the museum remained partially operational throughout the renovation. All work was strategically performed during designated hours when university security was on site. The project team proactively planned all activities and maintained close communication with museum staff and security personnel to accommodate the building’s operational requirements. Today, the building’s 100-year-old marble floor has been completely replaced and is ready to serve the University of Michigan for another 100 years.
We are eager to hear from you so that we may provide our expertise and resources based on your specific needs. We work hard to deliver real solutions in real time, no matter how big or small.
Build With Us