GM Pontiac Assembly 16 Bay Addition

Client:

General Motors

Project Stats

Pontiac, MI

Location

General Motors

Owner

Ghafari Associates

Architect

Design-build, General Contracting, Self-Perform Civil, Self-Perform Concrete, Self-Perform Miscellaneous Steel Installation

Services

39,000 SF

Project Size

Project Overview

Ideal Contracting was the 3D BIM design-build general contractor on a new 39,000-square-foot Sequencing Facility Addition to the Pontiac Assembly Center in Pontiac, Michigan.

The new 16 bay steel building was built on a foundation comprised of concrete caissons, grade beams and pile caps, with an exterior wall system of 2” insulated foam panels. The building included 16 truck docks with overhead doors and dock levelers, as well as 2 grade-level truck doors. In addition to this, the scope of work included interior masonry restrooms, team rooms, new and relocated site utilities, site concrete/asphalt paving, and site landscaping.

The new building serves two functions, one as a warehouse in approximately half the space and the balance as a parts sequencing area for the new truck line. Working with Ghafari Associates, the project took five months to complete and was finished on schedule and under budget.

Project Highlights

  • (16) Bay building
  • 3D BIM Design-Build
  • 39,000 SF