GM Lansing Grand River LOC + Contiguous Stamping Plant

Client:

General Motors

Project Stats

Lansing, MI

Location

Barton Malow

Owner

Ghafari Associates

Architect

Design-build, Self-Perform Miscellaneous Steel Installation, Self-Perform Structural Steel Erection

Services

675,000 SF

Project Size

Project Overview

Ideal was contracted to self-perform the structural and miscellaneous steel for the GM Lansing Grand River Logistical Operations Center (LOC) and Contiguous Stamping Plant.

The project was delivered utilizing design-build and consisted of Test Wing 3 & 4 Annex, New Building E, and a Central Utility Plant. These enhancements were necessary to accommodate 18 new dynamometer cells for testing Powertrains. The project also included several outbuildings, including fuel pumping, fuel storage, and tanks. The new 275,000-square-foot stamping plant required over 3,500 tons of steel and ties into the existing Body Shop. The LOC project included a 400,000-square-foot Logistics Center addition and required 1,100 tons of steel.

Project Highlights

  • 4,600 combined tons of structural steel
  • 275,000 SF Stamping Plant
  • 400,000 SF Logistics Center