Automotive + Manufacturing
General Motors invested in Flint, Michigan with a new state-of-the-art body shop. Ideal Contracting was awarded the design-build structural steel fabrication and erection package for this project, which consists of a 1-million-square-foot body shop addition as well as a 400,000-square-foot addition to the General Assembly.
The scope of work also included a 3,000-foot-long body conveyor from the new body shop to the General Assembly expansion. Combined, the Body Shop addition, General Assembly addition, and trestle consist of 11,000 tons of structural steel. As part of the design process, the estimating team determined that the most efficient and cost-effective way to erect the steel was to have two cranes working side by side. This made for a fast-paced schedule for the construction team. The Body Shop and trestle were erected within 10 months. General Assembly, consisting of 2,700 tons of steel, was erected in just 4 months.
We are eager to hear from you so that we may provide our expertise and resources based on your specific needs. We work hard to deliver real solutions in real time, no matter how big or small.
Build With Us