Automotive + Manufacturing
Ideal Contracting was awarded the Asset Sustainment project at the Global Tech Center in Warren, MI. The scope included the removal and replacement of both the existing steam boilers and chillers, which serve 16 facilities on campus. The existing plants were housed in a historically recognized building, so the work had to be executed meticulously to maintain the historical nature of the facility.
Phasing of the demolition and installation was critical to maintaining services to the campus during construction. This required precise planning and close coordination with all stakeholders. Six boilers were replaced with new 90,000 lbs./hr. units and four chillers were replaced with four new chillers and all associated piping systems to provide 12,000 tons of cooling capacity.
Due to structural and safety concerns, the project team proposed rigging the boilers into the building through the roof. Numerous meetings were held regarding set locations, required openings, and rigging plans to ensure the lift occurred without issue.
(6) Boilers replaced
(4) Chillers replaced
12,000 tons of cooling capacity created
We are eager to hear from you so that we may provide our expertise and resources based on your specific needs. We work hard to deliver real solutions in real time, no matter how big or small.
Build With Us