Heavy Industrial
The Bluewater Gas Storage project consisted of installing a new compressor designed to increase Bluewater’s operating pressure. Ideal Contracting self-performed the excavation and concrete work for this project. The scope included earthwork, fencing, laydown areas, concrete foundations, landscaping, and soil erosion control measures. Approximately 1,537 CY of concrete was placed for the foundations, 53,000 tons of fill material was imported to construct on site building pads and berms, 2,000 LF of electrical trench was excavated and backfilled for underground electrical.