FCA is building Detroit’s first new assembly in nearly 30 years on the site of the former Mack Avenue Engine Complex. With an investment of $1.6 billion, the Mack transformation project will allow the OEM to manufacture a new three-row, full-size Jeep SUV and next-generation Jeep Grand Cherokee, along with their electrified models. The company is constructing a new 790,500-square-foot paint shop and renovating two engine plants into a body shop and general assembly.

To connect the three separate buildings, Ideal Contracting erected two trestles to house the conveyors that will carry the SUVs from the body shop to the paint shop, then on to general assembly.  Consisting of 2,500 total pieces of steel, the trestles combined weigh 1,400 tons and span 450 linear feet.

As part of this project, the team is also completing renovations to multiple interior spaces throughout the complex.  These areas include the Test Track, Drum Storage, Dyno Room, Penthouse, and the Guardhouse and Linker building. The scope of work includes new paint; installation of electrical, mechanical, and fire protection; and demolition and installation of new door frames and wall panels.

With over 20 subcontractors on-site, coordination has been key to keeping the project on schedule. The project has already logged more than 20,000 total man-hours with zero safety incidents.

 

April 21, 2020

FCA Mack Assembly Plant Trestles

FCA is building Detroit’s first new assembly in nearly 30 years on the site of the former Mack Avenue Engine […]
November 26, 2019

Fulfillment Center

Ideal Contracting self-performed the structural steel for a large fulfillment center located in Grand Rapids, Michigan.  The four-story, one-million-square-foot distribution […]
November 26, 2019

Stryker Instruments Division Facility

The Stryker Instruments Division Facility is a new 475,000-square-foot manufacturing facility located in Portage, Michigan.  In order to turn the […]
October 25, 2019

GM Building 31 Emissions Sustainment Phase 2

Ideal Contracting was awarded the General Motors Building 31 Emissions Sustainment project which consisted of the build-out of (4) new […]
August 22, 2019

Confidential Automotive Corporation Data Center

This new building will centralize IT operations in one location to house and maintain back-end IT systems and data stores. […]
August 22, 2019

GM Building 31 Office Renovation

The Building 31 Office Renovation project included the demolition and renovation of 37,500-square-feet of office space. The scope of work […]
August 22, 2019

GM Asset Sustainment

Ideal Contracting was awarded the Asset Sustainment project at the Global Tech Center in Warren, MI. The scope included removal […]
August 22, 2019

Toyota Powertrain Lab Expansion Phase 2

The Toyota Powertrain Expansion Phase 2 project was one of the final projects in Toyota’s 4-year corporate realignment.  It provided […]
August 22, 2019

FCA SHAP South Paint Shop Program

As a major renovation for FCA, the SHAP 2018 program included a complete renovation to the 356,250 square-foot Sterling Heights […]