• VENDOR PORTAL
  • Contact Us
  • VENDOR PORTAL
  • CONTACT US
  • ABOUT US
  • PROJECTS
  • SERVICES
  • SAFETY
  • CAREERS
  • NEWS
  • About
  • Core Values
  • Quality
  • Leadership
  • Supplier Diversity
  • Awards
  • Community
✕
Steven Sinn: Week 6 DEC
July 12, 2016
Week Eight: Michael Alberda
July 14, 2016

Chris Kuenzer: Flint Site Visit

July 13, 2016
Categories
  • 2016
  • Barton Malow
  • Build U
  • First Aid
  • Ideal Contracting
Tags

Today I had the chance to visit with Travis in Flint. The main thing that I wanted to see was two massive AHU’s that were being lifted onto the roof. These AHU’s are brought to the job site in pieces, and then they are assembled on a trailer, and hauled to the crane when they are ready to lift them into place. They use a custom built frame and rigging to hold each AHU, as their shape and size makes it too difficult to lift normally. Once the unit is on the roof, it gets oriented into place using the tag lines, and there was four iron workers in man lifts who would secure the AHU to the structure. After it is secured, a second smaller piece is lifted and bolted onto the top of the AHU using a different rigging method.

Share

Related posts

September 21, 2022

Upcoming 2022 Fall Career Fairs


Read more
July 25, 2022

Volunteer Day in Scarcyny Park


Read more
July 26, 2019

Creating Collaborative Spaces


Read more
  • Phone
    313.843.8000
  • Address
    2525 Clark Street, Detroit MI, 48209

Helpful Links

  • About Us
  • Projects
  • Services
  • Safety
  • Careers
  • News and Insights

Social Media

Stay Connected

Sign Up for Our Newsletter


    © 2023 Ideal Contracting. All Rights Reserved.